Short answer: builders' own 2026 prices for a new detached ADU (a backyard cottage) run from about $150,000 to $500,000 all-in, depending on size, region and the site. Garage conversions and junior ADUs cost less: one Sacramento-area builder's price list starts junior ADUs at about $85,000 and garage conversions at about $95,000. Alameda County's ADU program suggests $400 to $550 per square foot, design and fees included, as a rough guide for the Bay Area. State law keeps some fees down: no impact fees on an ADU of 750 square feet or less, and school fees only above 500 square feet.
Published ADU prices in California
There is no official price list for ADUs. The table collects every California price range we could find that a builder or a public body published itself. Builder figures are marketing figures: they show what each company says it charges, not what your project will cost.
| Source | Price | What it covers |
|---|---|---|
| Alameda County ADU programCounty government, undated page | $30,000 to $400,000+ | From a simple junior ADU inside the house to a large detached ADU on a hillside; "$400-$550 per square foot" as a rough placeholder for construction plus design and fees |
| Abodu cost guideBuilder (prefab), March 2026 | $150,000 to $400,000 | "a complete backyard ADU"; by region: Central Valley $150,000 to $250,000, Los Angeles $200,000 to $350,000, San Diego County $225,000 to $375,000, Bay Area $300,000 to $500,000 |
| Abodu fixed pricesBuilder (prefab) | $298,800 to $498,800 | Expected all-in price, 385 sq ft studio to 1,195 sq ft three-bedroom; a $6,000 boundary survey package and sales tax are extra |
| SnapADUBuilder, San Diego, November 2026 | $300,000 to $450,000+ | New detached ADU in San Diego, all-in, "about $375 to $600+ per square foot" |
| Upside ADUBuilder, Sacramento region, June 2026 | $165,000 and up | Detached ADU, turnkey, $250 to $360 per sq ft; the page gives both $432,000 and $500,000 as the top of the range |
| CALI ADUDesign and permit firm, Los Angeles, October 2026 | $165,000 to $420,000 | Estimated build cost of a detached ADU in Los Angeles, plus $7,490 to $12,990 for plans and permit processing |
| MaxableADU matching service, updated October 2026 | from ~$350 or ~$500 per sq ft | "starts at about $350 per square foot" in San Diego and Los Angeles, about $500 in the Bay Area |
| UC Berkeley statewide surveyUniversity research, April 2021 | $150,000 median | Median construction cost of ADUs built before 2021, "$250/square foot"; a dated baseline, since construction costs have risen since |
Where the sources disagree: Abodu's guide says prefab units cost 15 to 25% less than site-built ones, while Maxable says prefab "typically cost about the same as a stick-built". Abodu's own fixed prices are above the totals in its own guide for similar sizes; the fixed prices include design, permits and fire sprinklers. SnapADU notes that the California Construction Cost Index rose 44% from January 2021 to December 2025, which is why the 2021 survey median is far below today's builder prices.
Cost by type of ADU
- New detached ADU (a separate backyard unit): the most expensive kind; see the table above.
- Garage conversion: Upside ADU (Sacramento region) publishes $95,000 to $173,600 for 380 to 620 sq ft; CALI ADU estimates $140,000 to $200,000+ for a straight two-car garage conversion in Los Angeles, and $175,000 to $245,000+ with a small addition.
- Attached ADU (an addition to the house): $150,000 to $289,000 for 450 to 850 sq ft in Upside ADU's Sacramento list, the only published range we found.
- Junior ADU (up to 500 sq ft inside the house): from about $30,000 for a simple conversion (Alameda County) to $85,000 to $160,000 in Upside ADU's list.
- Prefab or modular: Abodu's all-in prices above; Samara lists its Backyard unit "Starting at $152k plus installation", so site work and permits come on top.
Design, permit and utility costs
Abodu's guide puts design and planning at $5,000 to $15,000 (architectural plans $3,000 to $8,000, structural engineering $1,500 to $4,000, survey and soil reports $1,000 to $3,000), building permits at $2,000 to $8,000, plan check at $1,000 to $3,000 and utility connections at $2,000 to $10,000. SnapADU suggests budgeting "around $10-20/sqft in ADU permit fees", varying "greatly by city and unit size", and says extra utility work in San Diego often ends up "between $15-30K+". Fees are set city by city, so each city guide lists that city's own fee schedule.
What state law says about ADU fees
These rules come from the California Department of Housing and Community Development's ADU Handbook (March 2026), which summarizes state ADU law.
- Impact fees: none on an ADU with 750 square feet of interior living space or less. Above that, fees must be proportional to the main house: the handbook's example is a 1,000 sq ft ADU next to a 2,000 sq ft house, which "could result in 50 percent of the impact fee" for a new house (p. 22).
- School fees: school districts may charge developer fees only on ADUs over 500 square feet (p. 22). The state cap (Level I) is $5.38 per square foot, raised from $5.17 by the State Allocation Board on January 28, 2026.
- Utility fees: a conversion inside an existing house or garage, and a junior ADU, can't be charged connection or capacity fees as if it were a new home; other ADUs' fees must be proportionate. Fire sprinklers are required only if the main house needs them (p. 23).
- From January 1, 2027 (SB 1117): according to summaries by the law firms Holland & Knight and Brownstein, impact fees on an ADU larger than 750 sq ft will be charged only on the part above 750 sq ft, for up to two ADUs on a lot (Holland & Knight words the limit as projects proposing "less than two ADUs"). The same summaries report AB 956, which from 2027 makes cities approve up to two detached ADUs on a single-family lot.
How long it takes
- Permit deadlines: the city must tell you within 15 business days whether your application is complete (if it doesn't, the application is deemed complete), and must approve or deny a complete application within 60 days (if it doesn't, the application is deemed approved) (Handbook pp. 11, 14, 35, 51).
- Pre-approved plans: every city had to set up a pre-approved ADU plan program by January 1, 2025, and must decide within 30 days on a detached ADU that uses one of those plans (p. 50). The city guides list each city's program.
- The whole project: Alameda County says "Most ADU projects take 12-18 months to complete"; SnapADU says detached ADUs in San Diego "routinely take 12 to 24 months from concept to completion"; Abodu says "6-12 months".
How many ADUs California permits
Cities and counties issued building permits for 32,526 ADUs in 2025, almost three times the 12,146 of 2018, according to the state's Annual Progress Report data.
| Year | ADU permits issued | ADUs completed |
|---|---|---|
| 2018 | 12,146 | 3,308 |
| 2019 | 13,267 | 6,162 |
| 2020 | 13,455 | 8,394 |
| 2021 | 21,913 | 10,273 |
| 2022 | 26,875 | 14,242 |
| 2023 | 29,672 | 17,988 |
| 2024 | 31,589 | 20,686 |
| 2025 | 32,526 | 22,930 |
Source: California Department of Housing and Community Development, Annual Progress Report data, Table A2 (data.ca.gov, updated November 20, 2026), each project counted once. See ADU permits by city for the 30 busiest cities and how we count.
City guides
Each guide has the city's own fees, pre-approved plans, review times and permit counts, with sources.
- Cupertino Flat ADU building fees ($5,770 to $8,222); two school districts; plans only on the valley floor
- Los Altos $0 city building permit and plan check for ADUs; free city plans at 525, 854 and 1,190 sq ft
- Menlo Park New 2026 ADU ordinance; 800 sq ft guaranteed; $0 transportation fee; amnesty to 2023
- Sacramento City fees jump from about $5,300 to $10,600 at 750 sq ft; three free city-made plans
- San Diego No impact fees on the first two ADUs at any size; $737 plan fee; county plans with 30-day review
- San Jose ADU building fees $3,291 up to 750 sq ft; pre-approved plans with same-day permits
- San Mateo Flat permit fee $2,831.57 for a new ADU, about half with a pre-approved plan; new 2026 rules
- Santa Clara $747 sewer capacity fee per ADU; city pre-approved plans reviewed in 10 business days
- Saratoga Sewer fee up to about $8,100; surveyor site plan required; a third of the city is in the wildfire zone
- Sunnyvale No water or sewer connection fees for ADUs; gallery plans processed within 30 days
Paying for it
- The CalHFA ADU grant is closed. The state housing finance agency's grant of up to $40,000 has been fully allocated since December 28, 2023, and CalHFA warns that anyone offering to "help you get an ADU Grant" is running a scam.
- Property tax: only the value the ADU adds is assessed; the existing house and land are not reassessed (San Mateo County Assessor). Alameda County's example: $150,000 of added value at 1% is about $1,500 a year.
- Some cities and counties run their own ADU loan or fee programs; the city guides list the ones we found.
Checking a builder before you sign
The Contractors State License Board (CSLB) treats building an ADU as a home improvement project (CSLB ADU tips, revised November 2025). That means:
- The builder needs a B (General Building) licence; a C-47 licence covers installing a manufactured unit. Check the licence on CSLB's site.
- A written home improvement contract is required, and the down payment can't be more than $1,000 or 10% of the price, whichever is less (CSLB contract guide). It is against the law to collect payment for work not yet done.
- You have three days after signing to cancel (five if you are 65 or older), and CSLB advises getting at least three bids.
Want quotes from licensed builders?
Tell us where and what you want to build. If we can match you with a builder who holds a current California licence, we will email you and ask before passing your details on. No promise of a match or a reply time.
Sources
- Accessory Dwelling Unit Handbook California Department of Housing and Community Development, March 2026 (pp. 11, 14, 22-23, 35, 50-51)
- Housing Element Annual Progress Report data, Table A2 HCD on data.ca.gov, updated November 20, 2026
- Index adjustment on the assessment for development State Allocation Board, approved January 28, 2026
- ADU budget County of Alameda ADU program
- First ever statewide ADU owner survey Terner Center, UC Berkeley, April 22, 2021
- How much does a backyard ADU cost in California in 2026? and Fixed pricing Abodu (builder), March 2026 and current
- How much does an ADU cost in San Diego? and Lessons from 100 completed backyard homes SnapADU (builder), November 2026
- ADU cost in Sacramento, published 2026 prices Upside ADU (builder), June 2026
- ADU cost in Los Angeles (2026) CALI ADU (design and permit firm), October 2026
- Cost to build an ADU: California breakdown Maxable, updated October 2026
- Backyard Samara (prefab builder)
- California's 2027 housing laws Holland & Knight, October 22, 2026; California enacts another wave of 2026 housing bills Brownstein, October 13, 2026
- ADU Grant Program California Housing Finance Agency
- Accessory dwelling unit FAQ San Mateo County Assessor
- Tips for building a residential ADU and Terms of agreement: a consumer guide to home improvement contracts Contractors State License Board